EVDO测试_Step_by_Step_version_2_CMU 1X EV-DO AT测试步骤所有测试基于3GPP2 C.P0033-ACMU200测试前的设置 1. 按”RESET”键初始化CMU200 2. 按”Menu Select”键,选择”IMT-2000 Mobile Station”中的”1X-EVDO Signaling”应用3 接收机测试项目: 3.2.1 Demodulation of Forward Traffic Channel in AWGN 3.3.1 Receiver Sensitivity and Dynamic Range4 发射机测试项目: 4.2.1 Time Reference 4.2.2 Waveform Quality and Frequency Accuracy 4.3 RF Output Power Requirements4.3.1 Range of Open Loop Output Power 4.3.2 Time Response of Open Loop Power Control 4.3.3 Range of Closed Loop Power Control 4.3.4 Maximum RF Output Power 4.3.5 Minimum Controlled Output Power 4.3.6 Standby Output Power 4.3.7 RRI Channel Output Power 4.3.8 Code Domain Power4.3.8.1 DRC Channel Output Power 4.3.8.2 ACK Channel Output Power 4.3.8.3 Data Channel Output Power 4.3.8.4 DSC Channel Output Power 4.4.1 Cond……
猜您喜欢
评论